spray
christopher is back to finish up the deck railing

his fractured hand is all healed. his injury was the result of a deep sea fishing trip and a faulty toilet door.

five minutes into our day and he cut his leg. didn't really slow us down.

septic engineer and installer met to examin the system. spray heads did come up and started to do their job. engineer gave it the green light and we are good to go.
they noted that the water in the tanks was a bit high and asked me if any of the plumbing was hooked up inside. well,.... yeah we've been enjoying indoor plumbing.