« call for inspection | Main | field trip »

thumbs up

inspection went well, excepting a bit of electrical that is undone.  the inspector went ahead and gave the green light to move forward on the spray foam insulation that will go under the master suite and any other crack or crevice we can find.   he has to come back to inspect the insulation and will catch up w/ a few items that fell off todays list.
below is a pic of the fireplace install that has stalled.  we need some shorter sections of flue.  they keep those pieces in Kentucky.  we wait for the truck from KY to arrive.

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)