« the new look | Main | butter up my corners »

tension is mounting

still making the push to get everything ready for inspectors.  the plumbers have wrapped it up.  most fixtures are installed, all lines are capped and pressurized with city water! 
the pic below is the fixture that will fill our starck tub in the master bath.
the compression fitting in the kitchen island sprung a leak.  better now than later.
the shower pans have been fiberglassed and ready to be filled with water to show inspector their waterproofness.
and the puzzle of the siding continues.

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)