« parking lot full of trucks | Main | ice and snow delay »

tubed

it looks a bit chaotic. 
the hvac duct crew is moving fast.
all three bathroom fans are vented to the outside.  for the upstairs two bathrooms they vented either down or to a side wall instead of going through the roof.
the area around the sky light above the downstairs shower has been roofed.
one of my favorite stones

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)