lowered sill plates
windows should slide in without any more hassles, the bottom plate has been lowered (line on column is old height). I sure wish we'd have had windows installed before turkey day.... but patience is required to be in great supply for this sort of operation. they should be installed on monday. we receive our first set of doors next wed; week from today.
I am so looking forward to being able to go inside and close the doors and windows. although another setback is being worked out. our installer for the numerous massive sliding glass doors has taken on a new job. they are doing all the glass for the domain and can't spare a single crew for a single day. this really sucks because we thought this was all lined up and now we need to find somebody asap. I guess we fall behind neiman marcus in priority. this sliding glass business is all that will stop us from achieving dry in very soon.