« evidence of a second story | Main | adios to structural steel crew »

gussets

the structural steel continues.  they expect to finish up tomorrow.  I think they are hoping to find the corona "B" in the foundation.  the rented lift has been uncooperative lately and caused some complications.
tres came up with a solution to the weld plates that were not behaving.
now if we ever get a hurricane in central texas we should be firmly anchored.

Comments

the building package is put together by enerloc,

http://www.enerloc.com/

Thanks for sharing your construction experience on the blog. I'm contemplating similar work in Houston. Renovation, not new construction. Can you share info about the framing contractor and engineer you're using?

Thanks

Post a comment

(If you haven't left a comment here before, you may need to be approved by the site owner before your comment will appear. Until then, it won't appear on the entry. Thanks for waiting.)